With the plan bridge of Teluk Pasu-Pulau Sekati-Muzium Losong(refer to the map), Kuala Terengganu will have three bridges crossing the Terengganu River. With a cost of RM200 million, the bridge will be at least twice the cost of Sultan Mahmud bridge.
From the experience of constructing the Sultan Mahmud bridge, I believe the new bridge will be completed in 2016 i.e. planning take 3 years and construction take another 3 years.
I hope the construction will have participation from non-locals to avoid another Stadium Sultan Mizan calamity.
The bridge will make the Muzium and Taman Tamadun Islam more accessible since the road leading to the bridge has to be upgraded.